Respuesta :
Answer:
The planning time of the planner machine is 100 minute
Explanation:
Planning machine
A planning machine is a metal working machine that gives a flat surface to the work piece. Here the work-piece reciprocates and the feed is given to the tool. A planning machine is used for heavy duty work and are often large in size.
The machining time or the planning time of a planning machine is given by,
[tex]t_{m}[/tex] = [tex]\frac{L_{w}}{N_{s}\times f}[/tex]
where, [tex]L_{w}[/tex] is the total length of travel of job
= width of the job
= 300 mm
[tex]N_{s}[/tex] is number of strokes per min
= 10 double strokes per min
f is feed of the tool, mm per stroke
= 0.3 mm per stroke
Therefore, [tex]t_{m}[/tex] = [tex]\frac{L_{w}}{N_{s}\times f}[/tex]
= [tex]\frac{300}{10\times 0.3}[/tex]
= 100 min
Therefore the planning time is 100 minute.