Answer: 50
Explanation:
Since 5% of the values are missing, the expected number of records to be removed is interpreted as the expected value of the records to be removed whose probability of having missing values is 0.05.
Hence, the number of records that are expected to be removed is given by
Expected Value = (number of records)(probability of having a missing value)
= (1000)(0.05)
Expected Value = 50