The XYZ Company is planning to introduce a new product line and will build a new factory to produce the parts and assembly the final products for the product line. The new product line will include 110 different models. Annual production of each model is expected to be 1100 units. Each product will be assembled of 700 components. All processing of parts and assembly of products will be accomplished in one factory. There are an average of 12 processing steps required to produce each component, and each processing step takes 90 sec. (includes an allowance for setup time and part handling). Each final unit of product takes 2.0 hours to assemble. All processing operations are performed at work cells that each includes a production machine and a human worker. Products are assembled on single workstations consisting of two workers each. If each work cell and each workstation require 200 ft2, and the factory operates one shift (2000 hr/yr), determine: (a) how many production operations, (b) how much floorspace, and (c) how many workers will be required in the plant. If the company were to operate three shifts (6000 hr/yr) instead of one shift, determine the answers to (a), (b), and (c).