A cannery processed 1,445 pounds of strawberries in 4.5 hours. The cannery processed 2,320 of strawberries in 7 hours. Write a linear equation to model the relationship between the weight of strawberries S and time T. How many pounds of strawberries can be processed in 11 hours?
Well if we assume that this is linear then: The two points would be (T, S) = (4.5, 1445) and (7, 2320) The equation of the line that passes through these two points is S = 350T ‒ 130 At T = 11, S = 3720 Hope this is useful enough for you.