Answer:
1.5 cubic metres
Step-by-step explanation:
Given that in a concrete mix, cement makes up 1 part, sand makes up 2 parts and gravel makes up 3 parts.
The total number of parts = 1 + 2 + 3 = 6 parts.
The amount of marvel present the concrete mix = amount of marvel / total mix
= 3 parts / 6 parts = 1/2
Since 3 cubic metres of concrete is enough for the path, hence the amount of gravel needed is:
Amount of gravel = 1/2 * 3 cubic metres of concrete = 1.5 cubic metres