If 4 over 7 ton of concrete covers 7 over 8 of a bridge, how many tons of concrete are required to cover the entire bridge?

Respuesta :

Answer:

Your answer would be 32/49.

Step-by-step explanation:

4/7 tons = 7/8 x

4/7 / 7/8

32/49

The tons of concrete are required to cover the entire bridge is 32/49 tons.

What are fractions?

A fraction is a non-integer that is made up of a numerator and a denominator. An example of a fraction is 4/7.

How many tons is needed to cover the whole bridge?

To determine this value, divide 4/7 by 7/8

4/7 ÷ 7/8

4/7 x 8/7 = 32/49 tons

To learn more about the division of fractions, please check: https://brainly.com/question/25779356