Respuesta :
Answer:
Your answer would be 32/49.
Step-by-step explanation:
4/7 tons = 7/8 x
4/7 / 7/8
32/49
The tons of concrete are required to cover the entire bridge is 32/49 tons.
What are fractions?
A fraction is a non-integer that is made up of a numerator and a denominator. An example of a fraction is 4/7.
How many tons is needed to cover the whole bridge?
To determine this value, divide 4/7 by 7/8
4/7 ÷ 7/8
4/7 x 8/7 = 32/49 tons
To learn more about the division of fractions, please check: https://brainly.com/question/25779356