I need this down thanks

Answer:
5. is C which is 9.
6. is B which is 37.
Step-by-step explanation:
The first on is C. 9 because to find the interquartile range you need to subtract the upper quartile range by the lower quartile range. The upper is 16 and the lower is 7 so you do 16-7 which is 9.
The last question is B. 37 because the lower quartile range is first line in the box plot which is 37.