Answer:
These correspond to two types of cost: fixed cost and variable cost. Fixed cost (FC): the cost of all fixed inputs in a production process. Another way of saying this: production costs that do not change with the quantity of output produced. Variable cost (VC): the cost of all variable inputs in a production process.