Answer:
Rate at which pool is getting filled [tex]0.18[/tex] m/hr
Step-by-step explanation:
Given
Depth up to which the pool gets filled in two hours is equal to [tex]36[/tex] centimeter
As we know
One meter [tex]= 100[/tex] centimeter
So [tex]36[/tex] centimeter is equal to [tex]0.36[/tex] meter
Rate at which pool is getting filled is equal to height up to which water is filled in 2 hours divided by time taken
Rate at which pool is getting filled [tex]\frac{0.36}{2} = 0.18[/tex] m/hr