A factory process requires 3 steps to finish a product. The steps each have a mean completion time of
= 10 seconds and a standard deviation of g = 5 seconds. The time it takes to complete each step is
independent from the other steps. Let T be the total completion time of the 3 steps on a randomly chosen
product.
Find the mean of T.
HT=
seconds
Use a whole number.