Tobymorgan7416 Tobymorgan7416 13-11-2020 Engineering contestada At 800K, a plot of ln[cyclobutane] vs t gives a straight line with a slope of -1.6 s-1. Calculate the time needed for the concentration of cyclobutane to fall to 1/16 of its initial value.