Answer:
The answer is 12/5 days
Step-by-step explanation:
The First Man (FM) takes 4 days to complete the work
In one day he does (1/4)th portion of the work
The Second Man (SM) takes 6 days to complete the work
In one day he does (1/6)th portion of the work
The FM and SM together do [ (1/4 ) + ( 1/6) ] th portion of the work
So , [ (3+2 )/12] = ( 5 / 12 ) = 5/12 th portion in one day
Hence, FM and SM together complete the work in 12/5 = 2.4 days