Answer:
Materials handling= $60 per requisition
Machine setups= $110 per setup
Quality inspections= $95 per inspection
Explanation:
To calculate the predetermined manufacturing overhead rate we need to use the following formula:
Predetermined manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base
Materials handling= 60,000/1,000= $60 per requisition
Machine setups= 55,000/500= $110 per setup
Quality inspections= 57,000/600= $95 per inspection