Answer and Explanation:
The computation is shown below:
Predetermined overhead rate is
= Variable overhead cost per direct labor hours + Fixed overhead cost ÷ Direct labor-dollars
= $0.17 + $4,956,000 ÷ 8,260,000
= $0.17 + $0.6
= $0.77
Now the total cost is
= Direct material cost + direct labor cost + manufacturing cost
= $1,386,000 + $2,478,000 + ($2,478,000 × $0.77)
= $5,772,060