Answer:
Explanation:
Factors that should be considered before a decision is made on purchasing or investing should include anticipated costs or the chance of the product being made obsolete such that new products may need to be bought.
The energy cost of the new robotics should therefore be considered along with the chance that there may be better robots in the future such that there may be a need to replace the robotics to be acquired.
Training cost should also be considered as this is very integral to using the robotics effectively.
Sunk costs should not be considered as they have already be expended and no decision will reverse them.