Answer:
C. Job 1248, $22,000; Job 1249, $12,700
Explanation:
The computation of the total cost in the month of August is shown below:
Particulars Job 1248 Job1249
A Direct Material $15,000 $9,500
B Labour Hrs 175 80
C Labour rate $25 $25
D Labour cost (B ×C) $4,375 $2,000
E Overhead Rate $15 $15
F Overhead Cost (B ×E) $2,625 $1,200
G Total Cost (A+C+F) $22,000 $12,700
We simply added the direct material, labor cost and the overhead cost to determine the total cost and the same is to be considered