Answer:
The percentage effectiveness o the machine is [tex]E= 46.30[/tex]%
Step-by-step explanation:
From the question we are told that
The availability of the mixing drum is [tex]A_t = 18 \ hours = 18 * 60 = 1080\ minutes[/tex]
Amount of concrete produced per day is [tex]C = 10lb[/tex]
time taken to produce each pound of concrete is [tex]t = 50 \ minutes[/tex]
Time taken to set-up the machine is [tex]t_t = 10\ minutes[/tex]
The time it would take to produce 10 pounds of concrete is mathematically repented as
[tex]T = 50 * 10[/tex]
[tex]= 500 minutes[/tex] [This is because it take 50 minutes to
to produce one pound of concrete i.e (50
minutes to produce concrete )]
Hence the equipment effectiveness of the machine is
[tex]E = \frac{500}{1080} * \frac{100}{1}[/tex]
[tex]E= 46.30[/tex]%