Answer:
0.25
Explanation:
Process Capability measures the efficiency of a process
It is given by this equation
Cp = (USL-LSL)/6σ
Where USL is the upper Specification Limit = 1.003
and LSL is the Lower Specification Limit = 1 inch
σ is the standard deviation = 0.002 inches
Therefore
Cp = (1.003 - 1)/6 × 0.002
=0.003/0.012
Cp = 0.25