A construction company is digging a hole for a swimming pool. The whole will be 12 yards long, 7 yards wide, and 3 yards deep. How many cubic yards of dirt will the company need to remove?

Respuesta :

Answer:

the company will need to remove 252yd³ cubic yards of dirt

Step-by-step explanation:

a hole for a swimming pool has a rectangular prism shape

We know that the formula to calculate the volume of a rectangular prism is width by height by length.

depth we will call height

w = width

h = height

l = length

w * h * l = v³

we replace the values ​​we know

7yd * 3yd * 12yd = 252yd³

the company will need to remove 252yd³ cubic yards of dirt