Answer:
True
Explanation:
The plant wide overhead cost allocation rate is the rate that comes after dividing the estimated total manufacturing overhead by the total estimated cost allocation base i.e estimated machine hours or estimated machine labors
In mathematically,
Plant wide overhead cost allocation rate equals to
= (Estimated total manufacturing overhead) ÷ (Total estimated cost allocation rate)