A work crew spent four days paving a stretch of road. The table below shows
the length of road paved each day.
ROAD PAVING
Day
Length (miles)
Monday 5.5/6
Tuesday 6.3/6
Wednesday 8.4/6
Thursday 4.1/6
The entire length of the road will be 27 miles. What is the total remaining
length of road that needs to be paved after the four days?
Show your work.