Explanation:
Using,
S = vi*t + 1/2*a*tr^2
vi = initial velocity = 0 m/s
S = 1/2 * 9.8 * tr^2
= 4.9tr^2.
S = vf * (ta - tr)
4.9tr^2 = 330 * (9.3 - tr)
4.9tr^2 - 3069 + 300 * tr)
Using general quadratic equation,
tr = 8.93 s.
S = 4.9 * (8.93)
= 390.75 m.
B.
Therefore,
S = 4.9 * (9.3)^2
= 423.8 m.
The height of the cliff would be overestimated.