Answer:
Step 4: Evaluate the accuracy of the cost.
Explanation:
The six steps in cost estimation are in the following order
- define the cost object for which the related costs are to be estimated
- determine the cost drivers
- collect consistent and accurate data on the cost object and the cost drivers
- graph the data
- select and employ an appropriate estimation method
- evaluate the accuracy of the cost estimate
Step number 4 is suppose to be "graph the data" and not evaluate the accuracy of the cost (which is the last step)