Paul can install a 300-square-foot hardwood floor in 18 hours. Matt can install the same floor in 22 hours. How long would it take Paul and Matt to install the floor working together?A. 4 hoursB. 9.9 hoursC. 13.2 hoursD. 30 hours

Respuesta :

Answer: B. 9.9 hours

Step-by-step explanation:

Given : Paul can install a 300-square-foot hardwood floor in 18 hours.

We consider whole job as 1.

Rate of work per hour for Paul = [tex]r_1=\dfrac{1}{18}[/tex]

Matt can install the same floor in 22 hours.

Rate of work per hour for Matt = [tex]r_2=\dfrac{1}{22}[/tex]

Now , when they both work together , the rate of work = [tex]r=\dfrac{1}{t}[/tex] , where t is time taken by both together.

Since , [tex]r=r_1+r_2[/tex]

[tex]\dfrac{1}{t}=\dfrac{1}{18}+\dfrac{1}{22}[/tex]

[tex]\dfrac{1}{t}=\dfrac{11+9}{198}=\dfrac{20}{198}=\dfrac{10}{99}\\\\\Rightarrow\ t=\dfrac{99}{10}=9.9[/tex]

Hence, it would take 9.9 hours to install the floor working together.

Therefore , the correct answer is  B. 9.9 hours .

Answer:

9.9 hours

Step-by-step explanation: