Bramble Corp. purchased land as a factory site for $1350000. Bramble paid $124000 to tear down two buildings on the land. Salvage was sold for $8400. Legal fees of $5220 were paid for title investigation and making the purchase. Architect's fees were $46100. Title insurance cost $3700, and liability insurance during construction cost $4000. Excavation cost $15340. The contractor was paid $4500000. An assessment made by the city for pavement was $9500. Interest costs during construction were $252000. The cost of the land that should be recorded by Wilson Co. is?