Machine A produces 75 fishing lures per minute. Machine B produces 50 of the same lure per minute. How long will it take both machines running to produce 2100 fishing lures?

Respuesta :

written as a problem, this would be

75x + 50x = 2100

combine like terms

75x + 50x = 125x

125x = 2100

divide both sides by 125

2100 / 125 = 16.8

this means it will take 16.8 minutes, to produce 2100 fishing lures, I hope I helped :)

What is  time and work ?

A certain amount of time (T) is taken to complete a certain work (W). The number of units of work done per unit time is called the rate of work (R). Hence, Work (W) = Rate (R) Time (T) Whenever some work is done, the total work itself can be taken as one unit.

According to the question

written as a problem, this would be

75x + 50x = 2100

combine like terms

75x + 50x = 125x

125x = 2100

divide both sides by 125

2100 / 125 = 16.8

Hence , it will take 16.8 minutes, to produce 2100 fishing lures,

To learn more about time and work from here

https://brainly.com/question/3854047

#SPJ2