Answer:
6/5 hr, or 1 hr 12 min
Step-by-step explanation:
We're looking for the time required for two people to clear a field.
We'll end up with an expression that looks like:
1 job
------------ = time
rate
or
1 job
------------- this has dimensions of time (hr).
1 job/hr
specifically, we evaluate the following expression:
1 job
--------------------------------
1 job 1 job
-------- + --------
3 hr 2 hr
This simplifies to
1 1
-------------- = ----------- = 6/5 hr, or 1 hr 12 min
1/3 + 1/2 5/6