Answer:
The correct answer is 12 and a half or 13 weeks.
Step-by-step explanation:
First, convert the values to decimals.
27 1/2 = 27.5
2 1/4 = 2.25
Then, divide miles of road that need to be repaved by the number of miles that are repaved per week.
27.5/2.25 = 12.2222222222222
Round that up to 12 and a half weeks or 13 weeks.