Place the steps of the planning/control cycle in the correct order, with the first step listed at the top and the final step listed at the bottom.
a) Control the direction by comparing results with the plan.
b) Carry out the plan
c) Control the direction by correcting deviations and/or improving future plans
d) Make the plan