The average Waiting time and Turnaround time for the given problem using Round Robin Scheduling algorithm are:
a) Waiting time: 9, Turnaround time: 17
b) Waiting time: 6, Turnaround time: 14
c) Waiting time: 10, Turnaround time: 18
d) Waiting time: 7, Turnaround time: 15