What is the correct sequence for the first four steps of installing sill plates?
a. A - Establish the location of the sill plate.
b. B - Place sill plate stock around the foundation.
c. C - Measure from the center of each bolt to the chalk line.
d. D - Check to see that foundation is level and square.