Did Frank Greystock correctly include preliminary Engineering cost or should not include since it is considered a sunk cost?
a) Yes, he correctly included preliminary engineering costs.
b) No, he should not include preliminary engineering costs as they are considered sunk costs.
c) Preliminary engineering costs should be considered separately.
d) The analysis does not provide enough information to determine whether preliminary engineering costs should be included.