Investigate and analyse the site (i.e., 103 -105 Redfern Street, Redfern) using the site investigation report (Appendix A and B). You must identify and document the site features and available services to plan the site preparation. This includes identifying the following: Access, Batter/gradient, Earthworks and/or cut and fill, Existing services, Interpretation of topographical features, Orientation, Platforms, Retaining walls, Soil classification, Stormwater, Surface and subsoil drainage, Termite risk management, Trenches. From the soil engineer's report (Appendix A and B), you must identify and determine if the appropriate foundation is used for the site. Specify the footing system and document any variations that could exist if the design is changed. The footing systems include ________. Bored piers, Dewatering, Driven piles, Ground stabilization, Pad and pedestal footings, Pier and beam, Raft slabs, Retaining walls, Tanking. Identify and document any environmental issues that may impact the site according to regulatory requirements. How can this be controlled?