Sarah’s Organic Soap Company makes four kinds of organic liquid soap: regular, lavender, citrus, and tea tree. The demand for the four scents are 150, 120, 75, and 50 kg per hour respectively. Sarah’s production process can produce any soap at the rate of 450 kg per hour, but 1.5 hours are needed to switch between scents. During those switchover times, the process doesn’t produce any soap. Sarah wants to choose a production schedule that (i) cycles repeatedly through the four scents, (ii) meets the required demand and (iii) minimizes the amount of inventory held.
How many kg of regular soap should Sarah produce before switching over to another scent? (Round the answer to 3 decimal places.)