Chrisis54611 Chrisis54611 15-02-2024 Engineering contestada 1. Level and lower bucket to the ground. 2. Select 1ST OR 2ND GEAR depending on ground condition. 3. MOVE forward into the MATERIAL. 4. Raise and curl bucket to hold loadcorrect ordera) 1,2,3,4b) 2,3,4,1c) 2,3,1,4d) 4,3,2,1