alexfvdsdfgfd6703 alexfvdsdfgfd6703 15-02-2024 Engineering contestada Aluminum siding should be grounded. Recommendations state that the siding application should be connected to the cold water service or the electrical service ground with a ______ or larger wire. a) 6 AWG b) 8 AWG c) 10 AWG d) 12 AWG