) A petroleum engineer at the State Oil Company of the Azerbaijan Republic (SOCAR) wants you to perform a capitalized cost analysis for the following pipeline routing, at 15% per year. (Section 4.4) Installation cost: $-248 million Pumping, operating, security: $-20 million per year Replacement of deteriorated pipe: $-50 million every 25 years Expected life: ∞ years