You are comparing two mutually exclusive projects, Project X and Project Z. The crossover point is 11.4 percent. You have determined that you should accept project X if the required return is 12.7 percent. This implies you should:A. accept Project Z if the required return is less than 12.7 percent.B. be indifferent to the projects at any discount rate above 12.7 percent.C. always accept Project X if the required return exceeds the crossover rate.D. always accept Project XE. accept Project Z only when the required return is equal to the crossover rate.