An asphalt binder will be selected for an asphalt pavement project designed as part of a high- volume traffic interstate corridor expansion. Temperature statistics are provided below. Which of the following can be true if selected binder for the project is chosen as PG 52-40? Lowest Yearly Air Temperature, °C: -41.40 High Air Temperature of high 7 days: 27.67 Low Pavement Temperature 50%: -31.50 Low Pavement Temperature 98%: -38.60 High Avg Pavement Temperature of 7 Days 50%: 49.47 High Avg Pavement Temperature of 7 Days 98%: 53.95 Pavement may experience rutting problems Pavement may experience cold temperature cracking problems It may work perfectly fine It may cost more