a 100-ft-long horizontal pipeline transporting benzene develops a leak 43 ft from the high- pressure end. the diameter of the leak is estimated to be 0.1 in. at the time, the upstream pressure in the pipeline is 50 psig and the downstream pressure is 40 psig.