cotton) using direct labor hours which are estimated to be 450,000 for the current year. the company has decided to experiment with activity-based costing and has created two activity cost pools and related activity cost drivers. these two cost pools are cutting (cost driver is machine hours) and design (cost driver is number of setups). total estimated machine hours is 200,000, and total estimated number of setups is 1,500. overhead allocated to the cutting cost pool is $360,000 and $585,000 is allocated to the design cost pool. additional information related to product usage by these pools is as follows. wool cotton machine hours number of setups